Solar Plant Interconnection Panels - Adani Green Energy

Supplied grid interconnection switchgear for a 50 MW solar power plant.

Client:
Adani Green Energy Ltd.
Location:
Bhuj, Gujarat
Project Value:
₹1.1 Crore
Duration:
3 Months
Completed:
28 Feb 2023
Equipment Used:
LT Switchgear, Compact Substations
Before
After

RRR Electricals supplied LT switchgear panels and a compact substation for grid interconnection of a 50 MW solar power plant, ensuring safe and reliable evacuation of generated power to the state grid.